Week Two Construction – laying the framework

SSE is powering through the building fitout to create our central HQ and campus in Ultimo.

It’s a crucial phase as we lay both the physical and digital framework that will transform the original Art Deco building into a cutting-edge space that inspires entrepreneurial thinking.

This week’s work includes framing internal walls to create flexible learning spaces (for small classes of 14 to large audiences of 250) as well as installing cables. All helping build a new platform to connect students from across NSW with a global network of entrepreneurs and mentors.

Follow @SSENSW on Instagram for regular updates on the construction program. If you would like any more information a particular aspect of the fit out please contact info@sse.edu.au